About us
-
About us
Downer is the largest provider of integrated services in New Zealand and employs more than 10,000 people from Kaitaia to Invercargill.
Learn more
-
-
What we do
-
What we do
Downer is a leading provider of integrated services in Australia and New Zealand.
Learn more -
-
-
Investors
-
Investors
View our latest ASX announcements as well as financial reporting, key dates and shareholder information.
Learn more
-
-
News and media
-
News and media
Keep updated with our latest news.
Learn more
-
-
Sustainability
-
Sustainability
We understand the importance of having a responsible and forward-thinking approach to sustainability.
Learn more
-
-
People and careers
-
People and careers
Our people are at the heart of everything we do.
Learn more
-
-
Contact us
-
Contact us
Downer has over 120 sites across New Zealand with our head office based in Auckland.
Learn more
-
Downer Case Study
Pauanui Harbour
11/05/2022
In 2020, Downer helped Powerco maintain their network through replacing a damaged 11KV marine cable in the middle of the Pauanui Harbour.
To allow for sufficient and increased energy supply before the busy holiday season, the team quickly mobilised to put a temporary solution in place. As the specialist marine cable was not available at the time and needed to be ordered from overseas, the team installed 300 metres of normal cable, and two joints in the middle of the harbour, which connected to the Tairua substation.
Challenge
A circuit breaker (CB2) in Pauanui was damaged and out of service, leaving the area’s 1500 Installation Control Points (ICPs) on limited load capability. Powerco required urgent assistance as Pauanui is a popular holiday destination for many New Zealanders, and they needed to have sufficient energy supply to meet the demand on the network. The only option to restore essential energy services to the community, was to urgently overlay the cable in harbour (as the local supply could not maintain growing load demand if this work was not completed in time). This would’ve otherwise required High Voltage generation to be installed and maintained at huge cost for the entire Christmas period.
When the cable was damaged, Downer put in a temporary solution to help keep the energy supply running through to the local area. The team then returned seven months later to put a permanent underwater cable joint solution in place. The team worked through challenging weather conditions and tide patterns to complete the project, so timing was key!
Previously, this was not something Downer would normally offer as it required a very specific skillset. However, Downer ensured that the team had training and development, with experienced Jointers in the business mentoring younger team members. The crew also completed a specialist certification to become certified in underwater cable jointing.
Solution
To allow for work to be completed, the project was delivered off season, as the area mainly services holiday homes and Pauanui welcomes summer visitors every year.
Outcome
Downer was able to broaden its capability through training and developing its talented people. This adds value to the Energy sector as a whole and enables us to provide specialist expertise for future projects.